April 20, 2012
Posted by Bill
Began digging behind the cabin, across the stream that flows into the creek, in preparation of installing three sets of 4” PVC pipes to provide secure access for Free Gas, Electricity, and Water to our workshop on the hillside.
No need for a backhoe – front loader works just fine!
Big Stone dug out from stream bed.
Put it in the creek below the crossing to prevent erosion.
Farmer Bill aka “Tractor Man
Tomorrow I will dig deeper to get below the stream bottom to set the three 4″ PVC PIPES in place.



